JM EPDM R Systems
- Product Descriptive Name
- Polyester-Reinforced Ethylene Propylene Diene Monomer Membrane
- Product Short Description
- Cured ethylene propylene diene monomer reinforced with a tough 1,000+ denier polyester mat
Meets the requirements of ASTM D 4637, Type II
Membrane: Cured EPDM (ethylene propylene diene monomer) reinforced with a tough 1,000+ denier polyester mat.
Fully Extruded: Produces fewer air voids, more uniform thickness and smoother sheets.
Vulcanization Process: Produces a redundant waterproofing monolithic membrane.
Polymer Formulation: Performs in extreme temperature climates and withstands differential movement.
UV-Stabilization Properties: Offers superior ozone and weather resistance delivering one of the longest service lives available.
Technical Expertise: Backed by 30+ years of EPDM experience and installations
Color: Black
When it comes to design, we've got the tools to get you from the desk to the roof. Here you will find all of the EPDM specifications, 3-part specs, details and installation guides. If you have any questions when it comes to installation, please contact our Specifier Services Group for design and your local technical representative for the field.
EPDM MASTER DETAILS | CAD | Year Term | |
E-FW-M1 EPDM Base & Wall Flashing with Coping Master Detail | DWG | - | |
E-FW-M1I EPDM Base & Wall Flashing with Coping Isometric View Master Detail | DWG | - | |
E-FW-M2I EPDM Self-Adhered Base and Wall Flashing with Coping | DWG | - | |
E-FW-M3I EPDM Self-Adhered Continuous Wall Flashing | DWG | 20 Year |
BASE TIE-IN DETAILS | CAD | Year Term | |
E-FW-B3 Base Tie-In - Fastener & Plate | DWG | 20 Year | |
E-FW-B4 Base Tie-In - Fastener & Plate On Wall | DWG | 20 Year | |
E-FW-B5 Membrane Flashing Base Tie-In (High Internal Pressure) | DWG | 20 Year | |
E-FW-B7 EPDM Self-Adhered Base with Vertical Reinforced Termination Strip - RTS | DWG | 20 Year | |
E-FW-B8 EPDM Self-Adhered Base with Horizontal Reinforced Termination Strip - RTS | DWG | 20 Year | |
E-FW-B9 EPDM Self-Adhered Base Flashing with Sealing Strip | DWG | 20 Year | |
3E-FW-B1 Base Flashing with Horizontal Termination Strip (RTS) | DWG | 30 Year | |
3E-FW-B2 Base Flashing with Vertical Termination Strip (RTS) | DWG | 30 Year | |
3E-FW-B3 Base Flashing with Horizontal Polymer Batten Strip | DWG | 30 Year | |
3E-FW-B4 Base Flashing with Vertical Polymer Batten Strip | DWG | 30 Year | |
3E-FW-B5 Deck Obstruction Base Flashing with (RTS) | DWG | 30 Year | |
3E-FW-B6 Base Tie In (F&P) with 6 inch Sealing Strip | DWG | 30 Year | |
3E-FW-B7 Base Tie In (Batten Strip) with 6 inch Sealing Strip | DWG | 30 Year | |
3E-FW-B8 Base Tie In (Polymer Batten Strip) on Wall 6 inch Sealing Strip | DWG | 30 Year | |
3E-FW-B9 Deck Obstruction Base Flashing with 6 inch Sealing Strip | DWG | 30 Year |
INTERMEDIATE TERMINATION DETAILS | CAD | TERM | |
E-FW-I3 EPDM Intermediate Termination with Termination Bar | DWG | 20 Year | |
E-FW-I4 EPDM Intermediate Termination with Through-Wall Counter Flashing | DWG | 30 Year | |
E-FW-I5 EPDM Intermediate Termination Below Wall Cladding | DWG | 30 Year | |
3E-FW-I1 Intermediate Termination with CF and Cut in Reglet | DWG | 30 Year | |
3E-FW-I2 Intermediate Termination with Surface MTD CF | DWG | 30 Year | |
3E-FW-I3 Intermediate Termination Below Wall Cladding | DWG | 30 Year | |
3E-FW-I4 Intermediate Flashing Attachment with Polymer Batten Strip | DWG | 30 Year | |
3E-FW-I5 Intermediate Flashing Cover with Polymer Batten Strip | DWG | 30 Year |
TOP OF WALL DETAIL | CAD | Year Term | |
E-FW-T1 Fabricated Metal Coping Over Adhered EPDM | DWG | 30 Year | |
E-FW-T4 Perma-Tite Continuous Cleat Coping System Over EPDM | DWG | 30 Year | |
3E-FW-T1 Top of Wall Termination with Stone Coping | DWG | 30 Year | |
3E-FW-T2 Presto-Lock Coping Over EPDM | DWG | 30 Year | |
3E-FW-T3 Fabricated Metal Coping Over Adhered EPDM | DWG | 30 Year | |
3E-FW-T4 Presto-Tite Fascia on Sloped Parapet | DWG | 30 Year | |
3E-FW-T5 Presto-Tite Fascia on Flat Parapet | DWG | 30 Year |
EPDM MEMBRANE SEAMING DETAILS | CAD | Year Term | |
E-MS-01 Reinforced EPDM Membrane Cut Edge Lap Caulk | DWG | - | |
E-MS-02 EPDM Membrane Side Lap & T-Joint | DWG | 20 Year | |
E-MS-03 EPDM Side Lap & T-Joint - 30 Year | DWG | 30 Year | |
E-MS-04 EPDM Side Lap & T-Joint - 30 Year | DWG | 30 Year | |
E-MS-05 In-Lap Fastening Method - Mechanically Attached | DWG | 20 Year | |
E-MS-06 In-Lap Fastening Method - Steel Deck | DWG | 20 Year | |
E-MS-07 In-Lap Fastening Method - Plywood Deck | DWG | 20 Year | |
E-MS-08 In-Lap Fastening Method - Concrete Deck | DWG | 20 Year | |
E-MS-09 In-Lap Fastening Method - Wood Plank Deck | DWG | 20 Year | |
E-MS-10 Reinforced Perimeter Strip Fastening Method | DWG | 20 Year | |
E-MS-11 Continuous Strip Fastening Method | DWG | 20 Year | |
E-MS-12 Polymer Batten Strip Fastening Method | DWG | 20 Year | |
E-MS-13 Slope Transition-Valley | DWG | 20 Year | |
E-MS-14 Slope Transition-Ridge | DWG | 20 Year | |
E-MS-15 EPDM Self-Adhered Slope Transition (Valley) | DWG | 20 Year | |
E-MS-16 EPDM Self-Adhered Membrane Butted End Lap | DWG | 20 Year | |
E-MS-17 EPDM Self-Adhered Side Lap and T- Joint | DWG | 20 Year | |
E-MS-18 EPDM Self-Adhered Side Lap - Sealing Strip and T-Joint | DWG | 20 Year | |
E-MS-PT1 Tape/Standard Sheet Assembly - Pre-Taped | DWG | 20 Year | |
E-MS-PT2 Tape/Standard Sheet Side Lap & T-Joint - Pre-Taped | DWG | 20 Year | |
E-MS-PT3 Tape/Standard Sheet Side Lap & T-Joint - 30 Year - Pre-Taped | DWG | 30 Year | |
E-MS-PT4 Tape/Standard Sheet Side Lap & T-Joint - 30 Year - Pre-Taped | DWG | 30 Year | |
E-MS-PT5 Tape/Tape Assembly - Pre-Taped | DWG | - | |
E-MS-PT6 Tape/Tape Side Lap & T-Joint - Pre-Taped | DWG | 20 Year | |
E-MS-PT7 Tape/Tape Side Lape & T-Joint - 30 Year - Pre-Taped | DWG | 30 Year | |
E-MS-PT8 Tape/Tape Side Lap & T-Joint - 30 Year - Pre-Taped | DWG | 30 Year | |
E-MS-PT9 Tape/Tape Side Lap With Polymer Batten Bar | DWG | 20 Year | |
3E-MS-01 Lap Splice 6 inch Sealing Strip | DWG | 30 Year | |
3E-MS-02 Lap Splice 6 inch Seam Tape | DWG | 30 Year | |
3E-MS-03 Lap Splice Under Wall Flashing with Sealing Strip | DWG | 30 Year | |
3E-MS-04 Lap Splice Over Field Seam with Sealing Strip | DWG | 30 Year | |
3E-MS-05 Lap Splice with 6 inch Sealing Strip Endlap | DWG | 30 Year | |
3E-MS-06 Lap Splice at Wall Flashing with Sealing Strip | DWG | 30 Year |
EPDM FLASHING CURB & CORNER DETAILS | CAD | Year Term | |
E-FC-01 Prefabricated Metal Curb Base Flashing | DWG | 20 Year | |
E-FC-02 Roof Hatch | DWG | 20 Year | |
E-FC-03 EPDM Inside Corner with RTS Strips | DWG | 20 Year | |
E-FC-04 EPDM Inside Corner with RTS Strips - 30 Year | DWG | 30 Year | |
E-FC-05 EPDM Inside Corner with Seam Tape | DWG | 20 Year | |
E-FC-06 EPDM Inside Corner with Seam Tape - 30 Year | DWG | 30 Year | |
E-FC-07 EPDM Outside Corner with RTS Strips | DWG | 20 Year | |
E-FC-08 EPDM Outside Corner with RTS Strips - 30 Year | DWG | 30 Year | |
E-FC-09 EPDM Outside Corner with Seam Tape | DWG | 20 Year | |
E-FC-10 EPDM Outside Corner with Seam Tape - 30 Year | DWG | 30 Year | |
E-FC-11 Prefabricated water tight metal Curb Base Flashing | DWG | 20 Year | |
E-FC-12 Wood Curb Base Flashing | DWG | 30 Year | |
E-FC-13 EPDM Inside Corner with Seam Tape and Vertical Wall Fastening | DWG | 20 Year | |
E-FC-14 EPDM Flashing Wall with Term Bar and Corner Coping | DWG | - | |
3E-FC-01 Prefab Water Tight Metal Curb Flashing 2 inch Max Flange | DWG | 30 Year | |
3E-FC-02 Prefab Water Tight Metal Curb Flashing 2-3 inch Flange | DWG | 30 Year | |
3E-FC-03 Outside Corner RTS Strip Layout | DWG | 30 Year | |
3E-FC-04 Inside Corner RTS Strip Layout | DWG | 30 Year | |
3E-FC-05 RTU Curb Flashing Sealing Strip | DWG | 30 Year | |
3E-FC-06 RTU Curb Flashing with Metal CF Sealing Strip | DWG | 30 Year | |
3E-FC-07 RTU Curb Flashing with RTS | DWG | 30 Year | |
3E-FC-08 Prefabricated Metal Curb Flashing with RTS | DWG | 30 Year | |
3E-FC-09 RTU Curb Base Flashing with Sealing Strip | DWG | 30 Year | |
3E-FC-10 RTU Curb and Counter Flashing With Sealing Strip | DWG | 30 Year | |
3E-FC-11 Outside Corner with JM Peel & Stick Flashing | DWG | 30 Year | |
3E-FC-11I Outside Corner with JM Peel & Stick Flashing Installation | DWG | 30 Year | |
3E-FC-12 Outside Corner At Welded Watertight Curb | DWG | 30 Year | |
3E-FC-12I Outside Corner At Welded Watertight Curb Installation | DWG | 30 Year | |
3E-FC-13 Inside Corner with JM Peel & Stick Flashing | DWG | 30 Year | |
3E-FC-13I Inside Corner with JM Peel & Stick Flashing Installation | DWG | 30 Year | |
3E-FC-14 Inside Corner with Separate Wall Flashing | DWG | 30 Year | |
3E-FC-14I Inside Corner with Separate Wall Flashing Installation | DWG | 30 Year | |
3E-FC-15 Outside Corner with Seam Tape | DWG | 30 Year | |
3E-FC-15I Outside Corner with Seam Tape Installation | DWG | 30 Year | |
3E-FC-16I Inside Corner with RTS Strips Installation | DWG | 30 Year | |
3E-FC-17I Outside Corner with RTS Strips Installation | DWG | 30 Year |
EPDM PROTECTION DETAILS | CAD | Year Term | |
E-PT-01 Support-Light | DWG | - | |
E-PT-02 Support-Medium | DWG | - | |
E-PT-03 Support-Heavy | DWG | - | |
E-PT-04 Walkway-Concrete Paver | DWG | - | |
E-PT-05 EPDM Peel & Stick Walkpads Over EPDM Membrane | DWG | - | |
E-PT-06 Ballasted EPDM | DWG | - | |
E-PT-07 Lightning Rod-Wall Mount | DWG | - | |
E-PT-08 Lightning Rod-Roof Mount | DWG | - | |
E-PT-09 JM ENRGY Anchor - EPDM | DWG | 20 Year | |
E-PT-10 Hurricane Peel Stop Anchor Bar | DWG | 20 Year |
PRE-MANUFACTURED (METAL) DETAILS | CAD | Year Term | |
E-FE-P1 JM Presto Lock Fascia Over EPDM | DWG | 30 Year | |
E-FE-P3 Rail Fascia System For Single Ply Roofs | DWG | 30 Year | |
E-FE-P4 JM Metal Drip Edge with JM EPDM Sealing Strip | DWG | 20 Year | |
E-FE-P5 JM Gravel Stop with JM EPDM Sealing Strip | DWG | 20 Year | |
3E-FE-P1 Presto Tite Fascia for Single Ply Systems | DWG | 30 Year | |
3E-FE-P2 Extended JM Presto Tite Fascia | DWG | 30 Year | |
3E-FE-V2 Roof Edge Gutter with Flange | DWG | 30 Year | |
3E-FE-V4 Metal Drip Edge with EPDM Sealing Strip | DWG | 30 Year | |
3E-FE-V6 Gutter & Metal Edge with EPDM Sealing Strip | DWG | 30 Year |
EPDM DRAINS & VENTS DETAIL | CAD | Year Term | |
E-DV-01 Vent Pipe | DWG | 20 Year | |
E-DV-02 Vent Pipe | DWG | 30 Year | |
E-DV-03 Through-Wall Scupper | DWG | 20 Year | |
E-DV-04 Through-Wall Scupper | DWG | 30 Year | |
E-DV-04I Through-Wall Scupper | DWG | 30 Year | |
E-DV-05 Primary Scupper with Tapered Drainage Sump | DWG | 20 Year | |
E-DV-06 Low Wall Primary Scupper Flashing | DWG | 20 Year | |
E-DV-07 Overflow Scupper | DWG | 20 Year | |
E-DV-08 Primary Drain Sump - Low Slope - Less than 3:12 Slope | DWG | 30 Year | |
E-DV-09 Primary Drain Sump - Steep Slope - Greater than 3:12 Slope Mech. Att. | DWG | 20 Year | |
E-DV-10 Primary Drain Sump - Steep Slope - Greater than 3:12 Slope Adhered | DWG | 20 Year | |
E-DV-11 Primary and Overflow Drain Sump | DWG | 30 Year | |
E-DV-12 JM EPDM Hercules Retrodrain | DWG | 20 Year | |
3E-DV-01 Roof Drain | DWG | 30 Year | |
3E-DV-02 Overflow Roof Drain with Water Dam | DWG | 30 Year | |
3E-DV-03 Primary Roof Drain Insert | DWG | 30 Year | |
3E-DV-04 Primary and Overflow Roof Drain | DWG | 30 Year | |
3E-DV-05 Through Wall Welded Scupper Sleeve | DWG | 30 Year | |
3E-DV-05I Through Wall Welded Scupper Sleeve | DWG | 30 Year | |
3E-DV-06 Wall Overflow Welded Scupper Sleeve | DWG | 30 Year | |
3E-DV-06I Wall Overflow Welded Scupper Sleeve | DWG | 30 Year |
EPDM FLASHING PENETRATION DETAILS | CAD | Year Term | |
E-FP-01 JM Peel and Stick Pipe Boot | DWG | 20 Year | |
E-FP-02 Field Fabricated Vent Pipe | DWG | 20 Year | |
E-FP-04 Metal Penetration Pocket Over EPDM | DWG | 20 Year | |
E-FP-05 Vent Pipe - Hot | DWG | 20 Year | |
E-FP-06 EPDM Pourable Sealer Pocket | DWG | 20 Year | |
3E-FP-01 Penetration with JM Peel and Stick Pipe Boot | DWG | 30 Year | |
3E-FP-02 Vent Pipe Penetration with Field Fabricated Flashing | DWG | 30 Year | |
3E-FP-03 Hot Stack Penetration with Field Fabricated Flashing | DWG | 30 Year | |
3E-FP-04 Metal Penetration Pocket with Peel and Stick Flashing | DWG | 30 Year | |
3E-FP-05 Penetration Pocket with Peel and Stick Flashing | DWG | 30 Year | |
3E-FP-06 Penetration Cover Strip Options for Pre-Molded Flashing | DWG | 30 Year |
EPDM TIE-IN FLASHING DETAILS | CAD | Year Term | |
E-TI-01 EPDM Transition to Sloped Shingle Roof | DWG | 20 Year | |
E-TI-02 Curb Tie-In to Roof | DWG | 20 Year | |
E-TI-03 Tie-In - Bituminous to EPDM | DWG | 20 Year | |
E-TI-04 Curb Tie-In to Roof with 6 inch Sealing Strip | DWG | 30 Year | |
E-TI-05 Curb Tie-In to Roof with 6 inch Seam Tape | DWG | 30 Year | |
E-TI-06 EPDM Self-Adhered Transition to Sloped Shingle Roof | DWG | 20 Year |
EPDM EXPANSION JOINT DETAILS | CAD | Year Term | |
E-EJ-01 Expansion Joint - Roof To Wall | DWG | 20 Year | |
E-EJ-02 Expansion Joint - Roof To Roof | DWG | 20 Year | |
E-EJ-03 Expand-O-Flash Curb To Wall Expansion Joint Cover- Style CF/EJ | DWG | 20 Year | |
E-EJ-04 Expand-O-Flash Roof To Roof Expansion Joint Cover - Style EJ | DWG | 20 Year | |
E-EJ-05 Expand-O-Flash Roof To Wall - Style EJ | DWG | 20 Year | |
E-EJ-06 Expand-O-Flash Curb To Curb Expansion Joint Cover - Style CF | DWG | 20 Year | |
E-EJ-07 Expand-O-Flash Curb To Wall Expansion Joint Cover - Style CF/EJ | DWG | 20 Year | |
E-EJ-08 Expand-O-Flash Curb To Curb Expansion Joint Cover - Style EJ/WC | DWG | 20 Year | |
E-EJ-09 Expand-O-Flash Curb To Wall - Style EJ/WC | DWG | 20 Year | |
E-EJ-10 EJ Roof to Roof with 6 inch Seam Tape | DWG | 30 Year | |
E-EJ-11 EJ Roof to Roof with 6 inch Sealing Strip | DWG | 30 Year | |
E-EJ-12 EJ Roof to Wall with 6 inch Sealing Strip | DWG | 30 Year | |
E-EJ-13 EJ Roof to Wall with 6 inch Seam Tape | DWG | 30 Year | |
E-EJ-14 Roof to Roof with Expansion Slip Plate | DWG | 20 Year | |
3E-EJ-01 EJ Roof to Wall with RTS Strip | DWG | 30 Year | |
3E-EJ-02 EJ Roof to Wall with 6 inch Sealing Strip | DWG | 30 Year | |
3E-EJ-03 Roof to Roof Expansion Joint with RTS Strip | DWG | 30 Year | |
3E-EJ-04 Roof to Roof Expansion Joint with 6 inch Sealing Strip | DWG | 30 Year | |
3E-EJ-05 Expand-O-Flash Curb to Wall EJ Cover (RTS) | DWG | 30 Year | |
3E-EJ-06 Expand-O-Flash Curb to Wall EJ 6 inch Sealing Strip | DWG | 30 Year | |
3E-EJ-07 Curb to Curb Field Fabricated Joint Cover with RTS Strip | DWG | 30 Year | |
3E-EJ-08 Curb to Curb Field Fabricated Joint Cover 6 inch Sealing Strip | DWG | 30 Year | |
3E-EJ-09 Curb to Curb Expansion Joint Cover with RTS Strip | DWG | 30 Year | |
3E-EJ-10 Curb to Curb Expansion Joint Cover 6 inch Sealing Strip | DWG | 30 Year |
EPDM FIT Self Adhered Details | CAD | Year Term | |
E-FW-B7 EPDM Self-Adhered Base with Vertical Reinforced Termination Strip - RTS | DWG | 20 Year | |
E-FW-B8 EPDM Self-Adhered Base with Horizontal Reinforced Termination Strip - RTS | DWG | 20 Year | |
E-FW-B9 EPDM Self-Adhered Base Flashing with Sealing Strip | DWG | 20 Year | |
E-FW-M2I EPDM Self-Adhered Base and Wall Flashing with Coping | DWG | - | |
E-FW-M3I EPDM Self-Adhered Continuous Wall Flashing | DWG | 20 Year | |
E-MS-15 EPDM Self-Adhered Slope Transition (Valley) | DWG | 20 Year | |
E-MS-16 EPDM Self-Adhered Membrane Butted End Lap | DWG | 20 Year | |
E-MS-17 EPDM Self-Adhered Side Lap and T- Joint | DWG | 20 Year | |
E-MS-18 EPDM Self-Adhered Side Lap - Sealing Strip and T-Joint | DWG | 20 Year | |
E-TI-06 EPDM Self-Adhered Transition to Sloped Shingle Roof | DWG | 20 Year |
VARIOUS (MISCELLANEOUS) DETAILS | CAD | Year Term | |
E-FE-V1 Wood Nailer Attachement | DWG | - | |
E-FE-V2 Metal Drip Edge with EPDM Sealing Strip | DWG | 20 Year | |
E-FE-V4 Gravel Stop with JM EPDM Sealing Strip | DWG | 20 Year | |
E-FE-V6 Gutter & Metal Edge with EPDM Sealing Strip | DWG | 20 Year | |
E-FE-V7 Gutter & JM Drain Bar | DWG | 20 Year | |
E-FE-V8 Gutter & Term Bar | DWG | 20 Year |
SINGLE PLY LIQUID FLASHING PENETRATION DETAILS | CAD | BIM | |
SPL-FP-02 EPDM Roof Multi-Pipe Penetration Flashing | DWG | - | |
SPL-FP-04 EPDM Square Tube Penetration Flashing | DWG | - | |
SPL-FP-06 EPDM Wide Flange Penetration Flashing | DWG | - | |
SPL-FP-07 Wide Flange Flashing Scrim Layout | DWG | - | |
SPL-FP-09 EPDM Angle Iron Penetration Flashing | DWG | - | |
SPL-FP-10 Angle Iron Flashing Scrim Layout | DWG | - |
2x4 Ft. Roof Insulation Fastener Placement - Adhered, Ballasted
4x4 Ft. Roof Insulation Fastener Placement - Adhered, Ballasted
4x8 Ft. Roof Insulation Fastener Placement - Adhered, Ballasted
EM-6 Mechanically Attached JM Reinforced EPDM (6" O.C.)
EM-12 Mechanically Attached JM Reinforced EPDM (12" O.C.)
EMR-6 10" RPS and Mechanically Fastened JM EPDM (6" O.C.)
EMR-12 10" RPS and Mechanically Fastened JM EPDM (12" O.C.)
FA-16 Fully Adhered Cover (16-24-32)
FA-8 Fully Adhered Cover (8-16-32)
CBUA-12-6-4 Cover Board Urethane Adhesive
ICBUA-8-4-4 Insulation and Cover Board Urethane Adhesive
*Please be sure to download the file before selecting your assembly.*
JM EPDM FIT SA Application Guide
JM Vapor Barrier Installation Guide
JM Vapor Barrier Installation Guide - Español
EPDM R FIT (MF) Installation Guide 2-Sided
EPDM R FIT (MF) Installation Guide 1-Sided
EPDM R FIT (MF) Installation Guide - 1-Sided - Español
JM All Season Sprayable Bonding Adhesive Installation Guide
JM All Season Sprayable Bonding Adhesive Installation Guide - Español
JM SP Liquid Flashing Installation Guide
JM SP Liquid Flashing Installation Guide - Español
EPDM Membrane Selector Guide - Español
Adhesives and Cements Selector Guide
Insulation and Cover Board Selector Guide
Join us this episode as we sit down with JM EPDM product manager, Curt Freidholdt. Get the scoop on Curt's passion for life, along with what brought him to Johns Manville today, and finally we cover some ground on valuable ideas related to EPDM.
Above It All is a podcast by Johns Manville dedicated to the roofing industry. The goal of this podcast is to bring knowledge from a Johns Manville perspective on trends, innovations, and people shaping the roofing industry. Join us as we dive head first into enriching conversations about the people and passion that are an integral part of the JM experience.
Our commitment to EPDM, and you, remains as strong as ever.
Learn the fundamentals of one of the industry’s core roofing products, EPDM.
Johns Manville offers one of the most comprehensive portfolios of commercial low-slope roofing solutions. We have a long standing dedication to providing solution-based systems for building owners.
Here you will find quick links and cheat sheets to Johns Manville roofing systems code approvals and ratings.
Guarantees and Roof Maintenance
Support services can include: conceptual product information, building science, wind uplift data, national and local code understanding, FM Global® and UL® regulations, fastening patterns and sheet layouts, installation guidelines and standard details.
Re-roofing mechanically attached or ballasted insulated single-ply systems now have the potential for recycling versus contributing to a landfill.
Your resource for all JM documents in one place.
The Submittal Wizard is a tool to help you pull together the necessary documents for your submittal package.